How long does this design process take?

There are a few variables that influence the delivery timeframe. We’ll communicate these with you from the start. As a rough guide, a standard residential block takes about 3-4 weeks to design.

Over the first couple of weeks we’ll conduct our site survey and present the draft concept. After your feedback we finalise the design plans and hand them over. The build stage then has its own separate time span to be negotiated with contractors.